maandag 26 november 2012

Tracklaying part 4; the turnout

Today I started the first turnout. First I laid the outer length and the first part of the point. The latter was made so the second part fits smooth against it:

Then I make the second part and the outer rail on the other side. Also I solder the point to one piece:

After that the inner railpieces are made. Here it takes dome time to make it fit properly:

It almost looks like a turnout, it only needs the guard rails:

And with them in place. Only the switch tie is to be made ready:

Later more!

Geen opmerkingen: