Monday, January 28, 2013

Electric and other work

 Yesterday I prepared the manual turnout control. This is the stuff I use to secure it:


Here the rod (3 mm thick) with the same thickness piece that goes to the switch tie. The small ones are for the maximum travel of the rod, here they still need to be adjusted:


And all three in one module. They will get wooden knobs but I still have to purchase them:


Electric wire lies ready for installing, short pieces will be soldered to the rail and then to a brass rod:


The rods are prepared tonight. This is wire that is used in electric home installations. I removed the insulation and made it straight in a drilling device:


Later more!

No comments: