Sunday, November 25, 2012

Tracklaying part 3

Today I started the laying of the rail. First I did a good brush on the first section of ties at the front. After that I started. The rail is from C&S from England and is code 80.

First I used 4 pieces of Wenz for spacing the rail at the correct gauge. They are screwed on the layout between 2 ties. After that I pushed the first microspikes in:


A liitle bit closer to see the spikes better. There heads are very small and hardly seen:



Checking again with the NMRA trackgauge:



A tryout with a loose H0 truck to see if it runs properly:



 And it does. Here are 2 links to youtube. The first I did with a Shay. The "tick" you here is not from the track but from the gears...:


And one with the 4-4-0 to be used:


Both are digital but now used with a analog controller. That's way they are more difficult to control. Better control will be obtained when using a digital system. My plan is, allthough I have a Lenz system, to build in a seperate system for this layout. I do have a Piko Digi1 system with a infrared controller that will do fine for this layout. It will be a better choice because the layout will be in the Dutch Railway Museum for a 3 to 4 month period in a special exhibit about railways in wartime. This layout will be the oldest railway to show.

My wife did some more work on the Lacy hotel. It now has a roof and front roof:


She now makes a stone chimney for the side wall and that is some work. Later more!

Thursday, November 22, 2012

Staining the ties part 2

Brushed a piece of track to see if it would become lighter. Well; yes, it did:




Looking good, isn't it? Later more!

Updated the page

Reworked all the labels so you can choose per category!

Staining the ties

Today i first brushed the ties with a steel and brass brush. After that I stained it with stain from Wenz Germany:



Overview:


Now it is needing drying time so that I can start lay my rail! Before laying it needs a second brush to make the ties more older and used.

Later more!

Wednesday, November 21, 2012

Mockup part 2

The Lacy hotel gets its definitive form.

Front:


Side:


Looks good, isn't it? I like it very much. The idea is to put later on some light in it. That way it is like it has life in it.

Later!

Tuesday, November 20, 2012

Mockup test of the Lacy Hotel

My wife does the building of the Lacy hotel for me. The front is partially ready so this morning we tried out the location to determine the depth of the building. We make it as a background building because there is not enough depth of the layout:



Now she can make the left sidewall and later on we make the final setup so she can make the right sidewall. Because of the round backdrop this is a little trickier to make.

Later!

Monday, November 19, 2012

Trying a closed car

Tonight I did first some trackwork. The last part was layed in place:




After that I tried a closed car. I already had a undercarriage build zo I started the framing out of 4 x 4 mm wood:


Put the frames together. See the example in H0, I measured from that one (build it 2010):


The roof rounders:


And in place:


Loose on the undercarriage:


And with the other stuff.It looks too short, next one will be 4 scale feet longer (28 instead of 24):


All in one line:


Later!